Abu Dhabi T1 disruption as final refurbishment stage begins

Passengers flying through Abu Dhabi Terminal 1 will face some disruption as the airport begins the final stage of the Terminal 1 refurbishment project.
Time Aerospace thumbnail

Owner and operator ADAC   has announced that the entrance and exit from T1 Car Park to Terminal 1 will be closed until June 11th

All passengers arriving to Abu Dhabi international Airport will be re-directed to use the entrance and exit from T1 Car Park to Terminal 3. All those coming to the airport to meet their arrivals or drop off their departures are advised to park in the airport car parks and then proceed to the lower level entrance of Terminal 3.